One estimating process, from tender to work preparation

For installation companies with an estimating department. We set Elephate up around the way you work and guide your team until it runs.

Estimating is one link. We look at the whole chain

A tender passes through several people before anything gets built. Elephate takes over the legwork. Your people make every decision.

  1. 01Tender comes inElephateReads the specification and lists the requirements and exclusions.Your teamDecides whether you bid.
  2. 02EstimatingElephateCounts the drawing and matches your items.Your teamApproves every round or switches it.
  3. 03Estimate and quoteElephateCalculates with your rates and installation times.Your teamSets the price and signs the quote.
  4. 04Job won and handoverElephateKeeps every decision about the specification, with the reason.Your teamProject management takes over without having to ask.
  5. 05Work preparationElephateDelivers the estimate as Excel, or puts it into your ERP.Your teamOrders and plans the work.

What you decide becomes a rule in the knowledge base. The next project calculates with it automatically.

One rule, every team

An administrator switches a standard on, and new projects in every team calculate with it straight away.

Handover. When the job is won, the justification is ready

Once the job is won, the work moves on to project management and work preparation. What was decided about the specification during estimating is kept with the project, with the reason.

  • Nothing in one person's headEvery decision about the specification can be traced.
  • From quote to itemProvenance for every line of the estimate.
More about Specifications

Not a tool thrown over the fence. We guide you at every step

Introducing a new system changes how a department works. That is why we do it together, for twelve weeks, on your own projects.

You supply, we set it upEstimates, work descriptions and price lists. We put in your cost structure, items and installation times.
A weekly check-inA fixed moment around the table with you. Online or on site, with as many of the people involved as possible.
Mirrored against your estimatesWe put the output next to how you estimate today. Every deviation makes it better.
A direct lineQuestions and reports get priority. What you miss, we take into further development.
How the pilot runs12 weeks
  1. wk 1–2Kick-off and set-up
  2. wk 3–4Configuration
  3. wk 5–9Adoption: projects run through Elephate
  4. wk 10–12Evaluation and decision
Discuss a pilot on your own projects.

Frequently asked questions

Very little. You supply examples: estimates, work descriptions and price lists. We set Elephate up. After that there is a fixed weekly moment with your lead user.

Yes. The pilot starts with one team. Teams that join later calculate straight away with the standards already in place.

That is why adoption is a goal of the pilot. The pilot only succeeds once your estimators understand the output, trust it and can check it themselves.

You set a role per person: who sets things up and who estimates. That keeps the basis everyone calculates with in good hands.

Your projects, lists and knowledge base are only visible within your workspace and remain yours. If you stop after the pilot, we delete them.