Elephate for Enterprise

Turn project requests into quotes and company knowledge

Elephate analyses the construction documents and calculates the estimate with your own items, rates and agreements. What you decide is kept, so every team calculates with the same knowledge. From one estimator to several teams.

Elephate figures it out. You decide

A project passes through estimating, management, project management and work preparation before anything gets built. At every step Elephate lays out what is needed, with its source. One of your people approves it, and that decision travels on to the next step.

2026-014New build, 24 homes

  1. 01Tender

    Elephate prepares: Specification analysis

    Risks
    6
    Gaps
    3
    Exclusions
    2

    Head of estimating

    Decides whether you bid.

  2. 02Estimating

    Elephate prepares: Room schedule

    Rooms
    216
    Fixtures
    312
    Items
    486

    Estimator

    Approves every round.

  3. 03Quote

    Elephate prepares: Estimate

    Materials
    € 96,400
    Labour
    € 61,250
    Total
    € 157,650

    Management

    Sets the price and signs.

  4. 04Handover

    Elephate prepares: Justification

    Decisions
    14
    With citation
    14
    Open questions
    0

    Project manager

    Has nothing left to ask.

  5. 05Work preparation

    Elephate prepares: Export

    Excel
    .xlsx
    CSV
    .csv
    ERP file
    .xlsx

    Work planner

    Orders and plans the work.

What you decide the same way more often becomes a rule in the knowledge base for the next project.

Made a decision? Your team learns too

Without a fixed basis, every estimator calculates in their own way. In Elephate, what you decide the same way more often becomes a rule in the knowledge base, with the projects it rests on. The next project calculates with it, including one from another team or a new colleague.

Provisional sum01Teams decide02It becomes a rule03Every project uses itTeam 4Project 2026-009Team 1Project 2026-014Team 3Project 2026-022Knowledge baseProvisional sums separate in the estimateNew project, team 2Calculates with the same ruleAnd every project after itRule 012From decision to ruleA decision by a teamA rule for every projectrests on 3 projects
  1. Team 4Project 2026-009
  2. Team 1Project 2026-014
  3. Team 3Project 2026-022
  4. Knowledge baseProvisional sums separate in the estimate
  5. New project, team 2Calculates with the same rule

A decision by a teamA rule for every project

Handover. After estimating comes work preparation

Once the job is won, the work moves on to project management and work preparation. They see what was decided about the specification during estimating: the cited passage, the decision and the reason. Even when the estimator has already moved on to the next project.

  • Nothing in one person's headEvery decision about the specification is kept with the project, with the page number.
  • From quote to itemFor every line of the estimate you see which requirement, count or agreement it comes from.
  • A colleague can carry onDuring illness, a holiday or after someone leaves, the project stays readable.
EstimatingSilencer Ø16024 pcsProject managementQuote, specification p. 11No noise requirement givenDecisionA silencer per unitReasonUnit sits next to a bedroomLine 4.12 of the estimateSilencer Ø160, 24 pcs2026-014Handover after the awardGoes along at handoverdecision 3 of 14
  1. Quote, specification p. 11No noise requirement given
  2. DecisionA silencer per unit
  3. ReasonUnit sits next to a bedroom
  4. Line 4.12 of the estimateSilencer Ø160, 24 pcs

Goes along at handover

Elephate sits on top. Nothing is replaced

Your software stays in place. Elephate calculates with the lists, rates and time standards you already use, and delivers the estimate in a form your systems can import.

  • What goes inSupplier lists as CSV, hourly rates, time standards and your own documents.
  • What comes outThe estimate as Excel or CSV, or as a file you import into your ERP.
  • Your data stays yoursOther customers cannot reach your data. We do not train AI models.
Already thereSupplier listItems and pricesTime standardsYour own installation timesHourly ratesPer tradeERPImports the estimateElephateCalculates with your sourcesConnected to what is already thereWhat goes inWhat comes outExcel, CSV or ERP file
  1. Supplier listItems and prices
  2. Time standardsYour own installation times
  3. Hourly ratesPer trade
  4. ERPImports the estimate
  5. ElephateCalculates with your sources

What goes inWhat comes out

Elephate is new. That's why we help you get started

Introducing a new system changes how you work, whether you estimate alone or with a department. That is why we do it together: twelve weeks, on your own projects. After that you decide whether to continue.

01You supply, we set it up

A few old estimates, work descriptions and price lists are enough. We put in your cost structure, items and time standards.

02A weekly check-in

A fixed moment every week, online or on site. Ideally with everyone who works with it.

03Mirrored against your estimates

We put the output next to an estimate you made yourselves. We trace every difference and work it into the set-up.

04A direct line

Questions and reports get priority. What you miss, we take into further development.

How the pilot runs

12 weeks
wk 1–2wk 3–4wk 5–9wk 10–12Then you decide
  1. wk 1–2Kick-off and set-up
  2. wk 3–4Configuration
  3. wk 5–9Adoption: projects run through Elephate
  4. wk 10–12Evaluation and decision
Discuss a pilot on your own projects.

Frequently asked questions

You supply examples: a few old estimates, work descriptions and price lists. We set Elephate up with them. After that there is a fixed weekly moment with your lead user, and you estimate your own projects in Elephate.

Yes. You start with one estimator or one team, on your own projects. Whoever joins later calculates straight away with the items, rates and time standards already in place.

That is why adoption is a goal of the pilot. The pilot only succeeds once your estimators understand the output, trust it and can check it themselves.

No. You estimate the way you are used to, just without the legwork. You get the estimate as Excel, with quantities, items, prices and subtotals per discipline.

No. Elephate is not an ERP and does not replace one. The estimate comes out as Excel or CSV, or as a file you import into your ERP.

You approve every round yourself. Every line shows its source and how confident the match is. What needs attention is listed first. What is wrong, you correct, and Elephate remembers it for the next project.

You give every colleague a role. An admin sets up the workspace: supplier lists, rates and time standards. A member estimates. A viewer can only look. That keeps the basis everyone calculates with in good hands.

Your projects, lists and knowledge base are only visible within your workspace and remain yours. The data is stored on servers in Germany and the AI processing happens in France. We do not train AI models. If you stop after the pilot, you have 14 days for a full export. After that we delete the data. The details are in our data statement.